Discover requirements for the Pre-Camp Work Plan module so that scope can be defined

XMLWordPrintable

    • Type: Story
    • Resolution: Done
    • Priority: Low
    • 1.0
    • Affects Version/s: None
    • None

      Scope

      Requirements discovery for the Pre-Camp Work Plan Preparation module. PRD v91 marks this as subjected to requirement. Implementation is deferred until scope is firmed up.

      Acceptance Criteria

      • [ ] Stakeholder interviews with camp organisers and supervisors
      • [ ] Field audit of how camps are currently planned
      • [ ] Draft Pre-Camp Work Plan module specification added to the PRD
      • [ ] Backlog stories populated under STOP-21

      Status

      Deferred — awaiting specification.

      PRD Reference

      §1.3 In Scope Functional Modules — Pre-Camp Work Plan

              Assignee:
              Rohit.Prajapati
              Reporter:
              Rupesh Singh
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: