CG Prod NCD Assessment Survey Incentive Generated in Current Month Instead of Activity Completion Month

XMLWordPrintable

    • Type: Bug
    • Resolution: Unresolved
    • Priority: High
    • 3.11.0
    • Affects Version/s: None
    • None
    • FLW Mobile App
    • Prod

      Description:
      While conducting assessment surveys for non-communicable diseases (NCDs), the required activity details were entered/completed in the previous month. However, the corresponding incentive is being generated in the current month instead of the month in which the activity was actually completed.

      Steps to Reproduce:

      1. Open the NCD Assessment Survey module.
      2. Complete the required assessment survey in the previous month.
      3. Enter/save the required details.
      4. Check the generated incentive in the Incentive module.
      5. Verify the incentive month.

      Actual Result:
      The incentive is generated in the current month, even though the assessment survey was completed in the previous month.

      Expected Result:
      The incentive should be generated in the same month in which the assessment survey was actually completed.

              Assignee:
              Saurav Mishra
              Reporter:
              Jaswant Kumar
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated: