Uploaded image for project: 'AMRIT'
  1. AMRIT
  2. AMM-1105

There is a variation date in ECD Call type date as well as Upload date

    XMLWordPrintable

Details

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Medium Medium
    • None
    • None

    Description

      Summary:
      Upload Date Not Displayed Correctly in ECD Associate and ANM Login

      Description:
      In the ECD module, under the Associate and ANM logins, the "Record Upload Date" is not aligning with the ECD call type date. Instead, it appears as per the lapse time calculation (LMP + 30 days).
      Additionally, there is a record where the "Upload Date" is identical to the "Lapse Time" calculation, causing discrepancies.

      Steps to Reproduce:

      • Log in to the ECD module using the Associate or ANM credentials.
      • Check the "Record Upload Date" for any ECD call type.
      • Observe that the "Upload Date" is calculated based on LMP + 30 days instead of the actual call type date.
      • Verify the record where "Upload Date" matches "Lapse Time."

      Expected Behavior:
      The "Record Upload Date" should be displayed as per the ECD call type date, not the lapse time calculation.

      Actual Behavior:
      The "Record Upload Date" reflects the lapse time (LMP + 30 days) calculation instead of the ECD call type date.

      Attachments

        Forms

          Activity

            People

              shashank.k@piramalswasthya.org Shashank Kharkwal
              rohit.jayaraman@piramalswasthya.org Rohit Jayaraman [X] (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                CucumberStudio

                  CucumberStudio data loading...